Hot water safety
Contents |
[edit] Introduction
Hot water is considered an essential building service. The two components of a typical hot water system are:
- The central heating system which supplies hot water to radiators located around a building.
- Domestic hot water supplied to taps and sometimes to appliances.
The water and pipework used for these two systems are not mixed, although both share some of the same components.
[edit] Hot water safety under Section G3 of Approved Document G
Section G3 of Approved Document G defines ‘domestic hot water’ as water that has been heated for cooking, food preparation, personal washing or cleaning purposes. Under Approved Document G, the “suitable installation for the provision of heated wholesome water or heated softened wholesome water” is required.
Section G3 provides specific guidance regarding hot water safety for sanitaryware (including washbasins, sinks, baths, showers and bidets) and other water storage systems (including cisterns or other water supply vessels). Under Section G3, systems should incorporate precautions to:
- Prevent the temperature of the water stored in the vessel at any time exceeding 100C.
- Ensure that any discharge from safety devices is safely conveyed to where it is visible but will not cause a danger to persons in or about the building.
Furthermore, the hot water supply to any fixed bath must be so designed and installed as to incorporate measures to ensure that the temperature of the water that can be delivered to that bath does not exceed 48C.
Section G3 provides specific information on additional areas, including
Guidance:
- Performance
- General
- Provision of hot water supply
Design and installation of directly or indirectly heated hot water storage systems:
- General
- Vented hot water storage systems
- Unvented hot water storage systems – all systems
- Unvented hot water storage systems – systems up to 500 litres capacity and 45kW power input
- Unvented hot water storage systems – systems over 500 litres capacity or over 45kW power input
Discharge pipes from safety devices:
Prevention of excessive temperatures
Prevention of scalding
Commissioning of fixed building services
Notice of completion of commissioning
[edit] Further guidance
In addition to the information in Approved Document G, further guidance for hot water storage system design and installation can be found in three British Standards Institution (BSI) documents:
- BS EN 806-5:2012 Specifications for installations inside buildings conveying water for human consumption. Operation and maintenance.
- BS 8558:2015 Guide to the design, installation, testing and maintenance of services supplying water for domestic use within buildings and their curtilages.
- BS EN 12897:2006 Water supply.
[edit] Related articles on Designing Buildings
- A guide to installing thermostatic mixing valves: what, why and how.
- Approved Document G.
- Building services.
- Hot water.
- Hot water safety in health and social care settings.
- Plumbing.
- Stagnation point.
- Tap.
- Water heating.
[edit] External resources
- BSI, BS EN 806-5:2012 Specifications for installations inside buildings conveying water for human consumption. Operation and maintenance.
- BSI, BS 8558:2015 Guide to the design, installation, testing and maintenance of services supplying water for domestic use within buildings and their curtilages.
- BSI, BS EN 12897:2006 Water supply.
- Gov.uk, Approved Document G.
Featured articles and news
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties at 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.